banner
Home / News / UPDATE: DEQ Extending Public Comment Period on Draft Air Quality Permit for CertainTeed Oxford Facility
News

UPDATE: DEQ Extending Public Comment Period on Draft Air Quality Permit for CertainTeed Oxford Facility

Sep 02, 2023Sep 02, 2023

The N.C. Department of Environmental Quality’s Division of Air Quality (DAQ) is giving an additional 3 weeks for public comment on a draft air quality permit for CertainTeed, LLC – Oxford Facility in Granville County.

Comments will now be accepted until Aug. 18, 2023. Also, the Division is now accepting comments via telephone, in addition to email and postal mail.

CertainTeed currently holds a Title V air quality permit to operate an asphalt roofing manufacturing plant in Oxford. The company has applied for a separate Title V air quality permit that would allow it to construct and operate a new fiberglass mat manufacturing facility beside the current plant.

The new CertainTeed facility would be considered a major source facility because potential uncontrolled air emissions of volatile organic compounds (VOCs) are above 100 tons per year and potential emissions of total hazardous air pollutants (HAPs) are above 25 tons per year.

These emissions will be controlled by two parallel regenerative thermal oxidizers. A dust collector would also control fugitive dust in the finishing area. The facility is subject to the National Emission Standards for Hazardous Air Pollutants (NESHAP) for Wet-Formed Fiberglass Mat Production and the NESHAP for Stationary Reciprocating Internal Combustion Engines.

Air dispersion modeling reviewed by DAQ shows the facility’s emissions of formaldehyde are expected to comply with applicable standards and will not cause an exceedance of the acceptable ambient levels.

The draft permit includes conditions that ensure ambient levels of all pollutants beyond the facility’s fence line comply with emission standards, including applicable health-based standards. The facility would also be subject to recordkeeping requirements and regular inspections.

Copies of the public notice, draft permit, draft permit review, draft environmental justice report, permit application, and a one-page project fact sheet are available online.

Comments or requests for a public hearing will be accepted until Friday, Aug. 18, 2023, at 5 p.m. Comments can be emailed to [email protected] with “CertainTeed.22A” in the subject line, or left via voice mail by calling 919-707-8726. Comments can also be mailed to:

NCDEQ Division of Air Quality1641 Mail Service CenterRaleigh, North Carolina 27699-1641

The Division will consider all public comments before making a final decision on the proposed permit.

If you need this information in Spanish or another language, please call 919-609-2189 or send an email to [email protected].

Si necesita esta información en español por favor llame al 919-609-2189 o mande un correo a [email protected] de Prensa (español)

until Aug. 18, 2023calling 919-707-8726